Piles and anchors¶
Step 6 has two panels: Piles and Ground anchors.
Piles¶
The panel is filled in only with a piled foundation, chosen in the Wall type step (one, two, three rows or free pile rows): otherwise a link leads to that step. The actions that the wall transmits to the foundation (horizontal force, vertical force and moment) reach the piles through a rigid cap.

Pile¶
| Field | Unit | Choices and notes |
|---|---|---|
| Pile type | Bored, Driven, Micropiles | |
| Diameter | m | |
| Length | m | the last soil layer must reach below the pile tip |
Row layout¶
With one, two or three rows:
| Field | Unit | Notes |
|---|---|---|
| First row axis from the toe edge | m | |
| Spacing along the wall | m | the same for all rows |
| Front, back, middle row inclination | ° | those needed by the number of rows |
| Staggered rows | from two rows up |
Below, the app shows the resulting row axes: the distance between the rows follows from the foundation geometry. With Free pile rows there is instead a table (+ Row) with, for each row, abscissa x [m], inclination [°], spacing [m] and stagger [m], up to eight rows.
The app checks the layout: inclination over 30°, axis outside the foundation or spacing smaller than the diameter are errors; spacing smaller than three diameters is a warning.
Soil interaction and actions on piles¶
| Field | Unit | Choices and notes |
|---|---|---|
| Lateral reaction | Constant, Increasing with depth | |
| Lateral subgrade modulus | kN/m³ | |
| Poisson's ratio | ||
| Fixed-head piles | checkbox; otherwise pinned | |
| Group efficiency (Converse-Labarre) | checkbox | |
| Actions on piles | Overturning moment, Resultant moment | |
| Share of load to piles | % | the rest goes to the soil under the cap |
| Investigated verticals | for the NTC 2018 correlation factors ξ |
Pile reinforcement¶
| Field | Unit | Notes |
|---|---|---|
| Reinforcement | Bars, Steel tube | |
| Bar diameter, Minimum number of bars | mm, — | with bars |
| Tube outer and inner diameter | mm | with the steel tube |
| Stirrup diameter | mm | |
| Maximum stirrup spacing | m |
The program distributes the actions among the rows, then checks every row: axial force, shear and moment at the head of the single pile, capacity and safety factor. The capacity of the pile group is that of the critical row, with the lowest factor; the reinforcement is on the envelope of the structural combinations and is shown in the Reinforcement step. The formulas are in RC sections, piles and anchors.
Note
For the wall on piles sliding, overturning and bearing capacity of the shallow foundation do not appear: the Piles (capacity) check replaces them. The Foundation pressures view shows the actions at the head of every row.
Ground anchors¶
Anchors are added with + Anchor (up to ten). Each one is a force applied to the stem, the working load divided by the spacing, which enters the equilibrium of the wall in all combinations with the TIR factor of the combination (1 in the generated ones).
| Field | Unit | Notes |
|---|---|---|
| Distance from the wall top | m | the anchor head must be on the stem |
| Downward inclination | ° | 0 to 60 |
| Free length, Bond length | m | |
| Bond diameter, Hole diameter | m | |
| Working load | kN | |
| Spacing | m | the force per metre of wall is the load divided by the spacing |
| Bond adhesion | kPa | |
| Bond friction | ° | |
| Number of strands | ||
| Steel strength | MPa |
With at least one anchor the common parameters appear: Safety factor, Prestress losses (%), Grout-steel bond (kPa), Strand diameter (mm) and Factor ξ.
The anchorage resistance is the smallest of the bond in the soil, the grout-strand adhesion and the steel; the check compares the design load with this resistance and appears in the panel as Anchors.
Note
The free length is not checked against a slip surface: that check belongs to global stability, which is coming.
Found an error on this page? Let us know or open a Pull Request.