Skip to content

Piles and anchors

Step 6 has two panels: Piles and Ground anchors.

Piles

The panel is filled in only with a piled foundation, chosen in the Wall type step (one, two, three rows or free pile rows): otherwise a link leads to that step. The actions that the wall transmits to the foundation (horizontal force, vertical force and moment) reach the piles through a rigid cap.

The Piles and anchors step of Guide 2 (Italian interface): two rows of bored piles, section with piles and stratigraphy

Pile

Field Unit Choices and notes
Pile type Bored, Driven, Micropiles
Diameter m
Length m the last soil layer must reach below the pile tip

Row layout

With one, two or three rows:

Field Unit Notes
First row axis from the toe edge m
Spacing along the wall m the same for all rows
Front, back, middle row inclination ° those needed by the number of rows
Staggered rows from two rows up

Below, the app shows the resulting row axes: the distance between the rows follows from the foundation geometry. With Free pile rows there is instead a table (+ Row) with, for each row, abscissa x [m], inclination [°], spacing [m] and stagger [m], up to eight rows.

The app checks the layout: inclination over 30°, axis outside the foundation or spacing smaller than the diameter are errors; spacing smaller than three diameters is a warning.

Soil interaction and actions on piles

Field Unit Choices and notes
Lateral reaction Constant, Increasing with depth
Lateral subgrade modulus kN/m³
Poisson's ratio
Fixed-head piles checkbox; otherwise pinned
Group efficiency (Converse-Labarre) checkbox
Actions on piles Overturning moment, Resultant moment
Share of load to piles % the rest goes to the soil under the cap
Investigated verticals for the NTC 2018 correlation factors ξ

Pile reinforcement

Field Unit Notes
Reinforcement Bars, Steel tube
Bar diameter, Minimum number of bars mm, — with bars
Tube outer and inner diameter mm with the steel tube
Stirrup diameter mm
Maximum stirrup spacing m

The program distributes the actions among the rows, then checks every row: axial force, shear and moment at the head of the single pile, capacity and safety factor. The capacity of the pile group is that of the critical row, with the lowest factor; the reinforcement is on the envelope of the structural combinations and is shown in the Reinforcement step. The formulas are in RC sections, piles and anchors.

Note

For the wall on piles sliding, overturning and bearing capacity of the shallow foundation do not appear: the Piles (capacity) check replaces them. The Foundation pressures view shows the actions at the head of every row.

Ground anchors

Anchors are added with + Anchor (up to ten). Each one is a force applied to the stem, the working load divided by the spacing, which enters the equilibrium of the wall in all combinations with the TIR factor of the combination (1 in the generated ones).

Field Unit Notes
Distance from the wall top m the anchor head must be on the stem
Downward inclination ° 0 to 60
Free length, Bond length m
Bond diameter, Hole diameter m
Working load kN
Spacing m the force per metre of wall is the load divided by the spacing
Bond adhesion kPa
Bond friction °
Number of strands
Steel strength MPa

With at least one anchor the common parameters appear: Safety factor, Prestress losses (%), Grout-steel bond (kPa), Strand diameter (mm) and Factor ξ.

The anchorage resistance is the smallest of the bond in the soil, the grout-strand adhesion and the steel; the check compares the design load with this resistance and appears in the panel as Anchors.

Note

The free length is not checked against a slip surface: that check belongs to global stability, which is coming.


Found an error on this page? Let us know or open a Pull Request.