Quick start (5 minutes)

A 4 m cantilever wall, a single soil layer, NTC 2018 checks with the site's seismic action. No credits are spent until the report.

1. Open the app

Go to nx.geostru.ai/mdc and sign in with your GeoStru account. If you only want to look around, File → Open the example loads a complete wall (Guide 1, 2 or 3): you can skip to point 5.

2. Create the wall

Open step 2 · Wall type. In a new project it shows the guided setup: choose Cantilever, type the Stem height (4 m) and press Create the wall. The app proposes the dimensions as the desktop program does (base 0.7·H, toe one third of the base, foundation depth H/10 and at least 40 cm), adds a sand layer and takes you to the Geometry step, where every dimension can be changed.

The guided setup of the Wall type step (Italian interface): seven wall types, stem height and the Create the wall button

3. Soil

In step 4 · Soils and water table check the proposed layer ("Sabbia", γ = 17.65 kN/m³, φ = 36°, δ = 24°) and type the parameters of your soil. Leave the water table out. The section in the centre is redrawn at every change.

4. Site and seismic action

  1. In step 1 · General data and site click on the map at the site (or type latitude and longitude) and press Save.
  2. In step 8 · Code and seismic action keep the NTC 2018 code, choose nominal life, use class, subsoil and topographic category, then press Calculate from the site: the table fills with TR, ag, F0 and Tc* of the four limit states.
  3. Press k_h and k_v from the site parameters (ULS-LS): the two wall coefficients go into the seismic combinations.

5. Read the checks

The Checks panel on the right shows overturning, sliding and bearing capacity with the safety factor of the governing combination, the required minimum and a utilisation bar; below, the ground pressures and the demand/capacity ratio of the RC sections. Red appears only on what fails. A click on an item opens the section view that explains it.

The Checks panel of Guide 1 (Italian interface): all checks satisfied, with Fs, minimum, utilisation and governing combination

If sliding fails, lengthen the heel or choose the With shear key foundation in the Wall type step and watch the number change.

6. Reinforcement, report and saving

Step 11 · Reinforcement lists the computed bars and the bar schedule. In step 12 · Report the preview is free; Generate Word and Download the section (DXF) use credits. Save the project with File → Save (.mdcnx) or to GeoDropbox.

The rest of the manual explains every step: start with the Workflow.