Skip to content

General data and wall type

The first two steps collect what applies to the whole project: who, where and what kind of wall. The code and the analysis options are in the Code and seismic action step.

General data and site

Step 1 has three panels. The data are typed in the form and stored with Save.

Panel Fields
General data Description, Client, Site, Designer, Date
Site location Address or place (with Search), Latitude, Longitude, Elevation [m], map
Engineering firm Header, Street, Town, Province, Postcode, Phone, E-mail, VAT number

Description, site, designer and engineering firm go into the report. For the site click on the map or drag the marker: latitude and longitude (WGS84) are updated. Search finds the place typed in the address field. The coordinates are used by the Code and seismic action step to obtain the seismic hazard parameters of the site.

Wall type

Guided setup

In a project without a wall, step 2 shows the guided setup (the same as the desktop): choose the type, type the Stem height (0.5 to 20 m) and press Create the wall. The seven choices:

Choice Wall created
Cantilever RC cantilever, longer heel
Cantilever, toe foundation RC cantilever, longer toe (when there is no room uphill)
Gravity plain concrete
Basement RC cantilever restrained at the top (floor slab)
On one, two or three rows of piles RC cantilever on bored piles

The proposed dimensions follow the rules of the desktop program:

  • cantilever and piles: base 0.7·H, top thickness and front batter 0.30 m, foundation depth H/10 (0.40 m if the result is less than 0.35 m), toe one third of the base (or heel, with the toe foundation);
  • gravity: top thickness 0.40 m, front batter 0.2·H, toe H/3;
  • piles: diameter 0.40 m, length 12 m, first row axis 0.60 m from the toe edge, spacing 1 m.

The setup also adds a sand layer (γ = 17.65 kN/m³, φ = 36°, δ = 24°) and the materials C25/30 and B450C. It is a starting point: the checks tell you whether it works. With a wall already defined, the setup is available again at the bottom of the step under Start over with the guided setup: it replaces the wall (general data and site stay) after a confirmation strip.

The guided setup of the Wall type step in a new project (Italian interface)

Structure, foundation and optional parts

With the wall defined, the step shows three panels.

Panel Choices
Structure RC cantilever, Gravity, On piles
Foundation Shallow, With shear key, One row of piles, Two rows of piles, Three rows of piles, Free pile rows
Profile and optional parts Back face (Vertical, Battered, Reverse battered, Stepped); Basement wall (restrained at the top); Back shelf; Front shelf; Blinding concrete

With a piled foundation the wall becomes "on piles"; with the shear key the app proposes its dimensions, to be adjusted in Geometry. The piled foundation applies only to the cantilever wall: with a gravity wall the app reports an error and does not compute. The dimensions of the optional parts are typed in the Geometry step.

Note

Gabion or block walls, stone masonry walls and counterforts in a desktop project open and stay in the file, but their calculation comes with the second release: the app says so in the step.


Found an error on this page? Let us know or open a Pull Request.